Building Regulations Principal Designer: what clients should expect


User Icon

Written By: Callum Snowden

Clock Icon

Estimated Time: 6 mins

Folder Icon

Building Safety


A Building Regulations Principal Designer (BRPD) should give the client a clear way to manage design-stage compliance, not simply another name on the consultant list. Under Part 2A of the Building Regulations 2010 in England, the role carries specific duties to plan, manage and monitor design work and coordinate designers so that, if the work is built to the design, it complies with the relevant requirements.

Appointing a BRPD does not transfer every compliance responsibility to one organisation. Clients, designers, the principal contractor and contractors retain their own duties. A useful appointment should therefore make responsibilities, information flow and compliance decisions clearer across the project.

Confirm the BRPD appointment and scope in writing

Where a project involves, or is reasonably foreseeable to involve, more than one contractor, the client must appoint a principal designer and principal contractor in writing for Building Regulations purposes. The client must also take reasonable steps to satisfy themselves that those appointed have the required competence or organisational capability.

The appointment should explain when the BRPD becomes involved, which design work falls within scope, what information is required and how unresolved compliance matters will be escalated.

For higher-risk building work requiring an application to the Building Safety Regulator, the statutory appointments must be made before that application is submitted. For other projects, they must be made before the construction phase begins. Earlier involvement can still be valuable because requirements and missing evidence can be identified while design options remain open.

Expect a working Building Regulations compliance process

The BRPD must plan, manage and monitor design work and coordinate matters relating to that work. The role does not replace every specialist designer. Instead, the BRPD needs sufficient competence to coordinate the team and assess whether the design, taken together, addresses the relevant Building Regulations requirements.

For clients, that should translate into a usable process. Depending on the project, this may include:

  • ✓identifying the requirements relevant to the design;
  • ✓assigning ownership of technical questions and evidence;
  • ✓tracking open compliance matters and decisions;
  • ✓checking that drawings, specifications and reports remain aligned; and
  • ✓recording how significant design changes affect compliance.

The process should remain proportionate to the project. The objective is clear coordination and traceable decisions, not paperwork for its own sake.

Agree how design changes will be reviewed

Product substitutions, revised layouts and altered construction details can affect several parts of the design. Clients should ask how the BRPD will identify changes that need further review, who must provide revised evidence and how related drawings, specifications or calculations will be updated.

A change log or compliance tracker can help, particularly where design work continues into construction, but it should support competent design and coordination rather than become a substitute for them.

Keep the Building Regulations and CDM Principal Designer roles clear

The Building Regulations Principal Designer and CDM Principal Designer are separate legal roles.

Under CDM 2015, the Principal Designer plans, manages, monitors and coordinates health and safety during the pre-construction phase. Under the Building Regulations dutyholder regime, the Principal Designer coordinates design work in relation to Building Regulations compliance.

The same competent individual or organisation can hold both roles. Where that happens, the client should make the Building Regulations appointment clear in writing and the project should distinguish which duties are being carried out under each regime.

Keep building control separate from the BRPD role

Building control performs a separate regulatory function. Depending on the project, that may involve a local authority, a registered building control approver or, for higher-risk building work, the Building Safety Regulator.

Building control does not replace the design team’s dutyholder responsibilities. The BRPD should help the design team organise its own compliance evidence and coordination while maintaining a clear boundary between design responsibility and regulatory oversight.

Ask for evidence that can be used throughout the project

A useful project record should show what has been addressed, what remains open, who owns the next action and which current drawing, specification, calculation or report supports the decision.

That information can support building control submissions, construction-stage coordination and handover, but it should not be presented as a guarantee of approval.

If the project scope changes significantly, the client should also reconsider whether the appointments, competence and resources remain appropriate.

enevo can act as Building Regulations Principal Designer where formally appointed, or provide related assurance and advisory support where another organisation holds the statutory role. If you are setting up a BRPD appointment or reviewing how design compliance will be coordinated, speak to our Building Safety team about the support your project requires.