The Footasylum AutoStore Works project involved the installation of a new automated storage system within an existing warehouse at Stakehill Industrial Estate in Middleton, Manchester.

The Hut Group engaged Glencar Construction to support delivery of the installation. Glencar appointed enevo as CDM Principal Designer, with a separate Registered Building Control Approver appointment through enevo Building Control.

What did the project require?

The proposed AutoStore installation needed to be coordinated with the warehouse’s existing structure, mezzanine, building services and operational areas, alongside associated operator and workstation areas.

Information available at appointment identified several design considerations. Existing building information was limited, with further surveys expected to inform the developing design. Roof access and safe systems of work also required consideration.

A sub-main electrical feed crossed the proposed AutoStore area, creating an interface with the planned storage system. The warehouse sprinkler installation was also under review by the insurer, with replacement sprinkler heads anticipated. Sprinkler provision and access therefore required coordination with Footasylum’s sprinkler contractor.

enevo’s involvement

enevo Building Safety was appointed as CDM Principal Designer to support Glencar and the wider project team with the management and coordination of health and safety risks during design and pre-construction.

The role focused on the interaction between the new automated installation and the existing warehouse, providing a structured process for identifying design interfaces, clarifying responsibilities and addressing foreseeable risks.

Separate Building Control appointment

enevo Building Control was separately appointed as Registered Building Control Approver for the internal alterations.

The appointment covered design assessment, the statutory Initial Notice process, Building Regulations consultation and planned site inspections during construction. Glencar accepted the appointment in February 2026, with the Initial Notice process subsequently taken forward by the Building Control team.

enevo Building Control operates separately from enevo’s consultancy services, maintaining the regulatory impartiality required of its Registered Building Control Approver function.

Project details

Appointing party: Glencar Construction

End client: The Hut Group / Footasylum

Location: Stakehill Industrial Estate, Middleton, Manchester

Services: CDM Principal Designer and separate Registered Building Control Approver appointment

Appointment: February 2026