Stay up to date. Follow us on LinkedIn



03301 901 200
info@enevo.co.uk
Close Search

Overheating Calculation
Part O Building Regulations


Overheating Calculation (Part O Building Regulations)

What is a Part O overheating calculation?



enevo provides Part O overheating assessments and TM59 dynamic thermal modelling for residential projects. We help developers, architects and self-builders identify a suitable assessment route, review the proposed design and understand the results before key decisions are fixed.


Part O sets overheating requirements for new residential buildings in England. Approved Document O explains two assessment approaches: the simplified method and dynamic thermal modelling. TM59 is an overheating assessment methodology used within the dynamic modelling route; it is not a separate Building Regulation or a replacement for the full requirements of Part O.


The right approach depends on your project and assessment purpose. Glazing, orientation, shading and ventilation all influence overheating risk. Considering them during design gives your team more opportunity to respond to the assessment findings.


Send us your project location, plans, elevations and available glazing and ventilation details. Tell us whether the assessment is for Building Regulations, planning or a wider design review so we can discuss the scope and provide a project-specific quote.

Send us your project details and we’ll send a quote

Our overheating calculation services

We offer both standard and advanced approaches to Part O compliance, covering projects of all sizes and complexity:

Quick calculations based on building area, window size, orientation, and ventilation. Best for standard house types or smaller projects. Icon

Simplified method assessments

Quick calculations based on building area, window size, orientation, and ventilation. Best for standard house types or smaller projects.
Detailed simulations using industry-leading software. This is suited to complex buildings or those with higher risk of overheating. Icon

Dynamic thermal modelling (DTM)

Detailed simulations using industry-leading software. This is suited to complex buildings or those with higher risk of overheating.
Guidance on passive cooling measures, shading, ventilation, and other design choices to help you meet regulations and avoid unnecessary costs. Icon

Clear compliance advice

Guidance on passive cooling measures, shading, ventilation, and other design choices to help you meet regulations and avoid unnecessary costs.
We coordinate with SAP Calculations and Part L requirements for a joined-up approach to building control approval. Icon

Integration with other compliance

We coordinate with SAP Calculations and Part L requirements for a joined-up approach to building control approval.
Quick calculations based on building area, window size, orientation, and ventilation. Best for standard house types or smaller projects. Icon

Simplified method assessments

Quick calculations based on building area, window size, orientation, and ventilation. Best for standard house types or smaller projects.
Detailed simulations using industry-leading software. This is suited to complex buildings or those with higher risk of overheating. Icon

Dynamic thermal modelling (DTM)

Detailed simulations using industry-leading software. This is suited to complex buildings or those with higher risk of overheating.
Guidance on passive cooling measures, shading, ventilation, and other design choices to help you meet regulations and avoid unnecessary costs. Icon

Clear compliance advice

Guidance on passive cooling measures, shading, ventilation, and other design choices to help you meet regulations and avoid unnecessary costs.
We coordinate with SAP Calculations and Part L requirements for a joined-up approach to building control approval. Icon

Integration with other compliance

We coordinate with SAP Calculations and Part L requirements for a joined-up approach to building control approval.
What will you receive? Icon

What will you receive?

enevo provides an assessment report and practical recommendations for your project team. The report should make clear:

  • The assessment purpose and method used.
  • The design information and assumptions assessed.
  • The assessment results and any identified shortfalls.
  • The design measures relied on and recommendations for further review.

For the Part O dynamic modelling route, Building Control should receive the modelling report and the Approved Document O compliance checklist. The checklist covers design information and completion verification, with contributions from the relevant project parties. Agree enevo’s reporting scope and responsibilities at the start, including any separate planning evidence required. Assessment documents support your submission; they do not guarantee Building Control or planning approval.

If glazing, shading, ventilation or other relevant design details change, tell the assessment team so the effect on the results and reporting can be reviewed.

What will you receive? Image

Our overheating calculation process

01


Project review
Share your drawings, specification and assessment requirements so we can review the project scope.

02


Method selection
We discuss whether the simplified method or dynamic thermal modelling is appropriate for your project.

03


Assessment and analysis
We carry out the agreed assessment using the supplied design information and relevant assumptions.

04


Report and recommendations
We provide the assessment results and practical recommendations for your design team to consider.

05


Follow-up support
We respond to assessment queries and discuss any updates needed if the design changes.

Which assessment method does your project need?

Part O and TM59

Choose the assessment route against the project brief and applicable guidance. Dynamic thermal modelling is an alternative route, rather than a method that can only be used after a simplified assessment has failed.

The simplified method is unsuitable for buildings with more than one residential unit where communal heating or hot-water systems have significant horizontal distribution pipework. Window-opening restrictions and other practical constraints also need to be considered when agreeing the assessment strategy.

For the current statutory guidance in England, see Approved Document O.

Simplified method

  • The design against the prescribed solar-gain and heat-removal provisions in Approved Document O.
  • Where the project falls within the method’s scope and the design can meet its provisions, including the applicable usability requirements.
  • The assessed design information, calculation results and measures relied on.

Dynamic thermal modelling

  • Predicted overheating performance using a detailed thermal model and the applicable TM59 methodology and Approved Document O provisions.
  • Where more detailed analysis or design flexibility is needed, or the simplified method is unsuitable.
  • The model assumptions, assessment results and design measures relied on.
Why choose enevo for Part O overheating calculations? Icon

Why choose enevo for Part O overheating calculations?

  • Decades of experience supporting residential developers, architects, and self-builders across the UK.
  • In-house expertise in overheating, energy, and sustainability compliance for a seamless service.
  • Fast turnaround and clear communication at every stage.
  • Recognised by national housebuilders, regional contractors, and local authorities for technical quality and practical advice.
  • Strong track record of helping projects achieve first-time approval.

Why choose enevo for Part O overheating calculations? Image

Frequently Asked Questions

Does Part O apply to extensions or conversions?

In England, Part O applies to new residential buildings, subject to the applicable transitional arrangements. It does not apply to extensions or conservatories added to existing residential buildings, or buildings undergoing a change of use. Conservatories forming part of a new residential building must meet Part O requirements. An overheating assessment may still be relevant for another purpose, such as a planning requirement or design review. Confirm the project brief before choosing the assessment route.

What information should I send for an assessment?

Send the project location, plans, elevations and available specifications for glazing, shading and ventilation. Include the building use, design stage and any assessment requirements from your planning or Building Control team. Explain which details are still being developed so the information needs can be discussed.

When should I arrange an overheating assessment?

Arrange the assessment while layouts, glazing, shading and ventilation can still be reviewed. Early engagement gives your design team more opportunity to consider recommendations before the specification is fixed.

What happens if the assessment identifies overheating risk?

We provide recommendations for your design team to consider, which may involve glazing, shading, ventilation or other design measures. Agree any design changes and reassessment scope with the team.

How can we help you
with your project?

Testimonial IconTrusted, Time And Time Again

5 Star Rating

Harry gave me excellent advice and clear understanding on what BREEAM means as well about the specific accredited assessing required by professionals like Harry.

Angela Singh

5 Star Rating

Very efficient and professional service. Cant recommend enevo enough, glad I chose them for my project.

William Brannon

5 Star Rating

Very impressive on all aspects of energy calcs. Responsive and cost competitive. Highly recommended

Nick Spencer

5 Star Rating

enevo are always helpful, friendly and efficient in carrying out SAP calculations for our clients.

Lizzie Hicks

5 Star Rating

enevo were fantastic from start to finish and helped make each step of the project run smoothly. I would highly recommend and we will definitely be using again, if needed in the future.

Rees Doyle

5 Star Rating

We have always found enevo to provide an excellent service in the preparation of SAP Calculations and Assessments as well as EPC Certificates for projects that they have worked on for us. They are also reasonably priced so we would certainly recommend them to anyone looking for this type of service.

Martin Booker

5 Star Rating

Used enevo from start to completion of our recent project of 2No. new builds. Services included SAP/EPC and property air testing. Great service, understanding of requirements and cost. Person friendly company and good with communication.

Mark Radcliffe

5 Star Rating

Very efficient, personal, professional service, with a quick report turnaround. Highly recommended if you're a self-builder trying to navigate the complexities of the latest regulations.

Edward Broadhead

5 Star Rating

Always efficient and prompt service, enevo are an asset to my company, having used their services on multiple developments I wouldn't hesitate to recommend them.

Mac Chappell

5 Star Rating

Great service with a fast turnaround. Communication was excellent throughout. Richard the engineer was polite and professional. Will certainly be using enevo again.

ECO PROPERTY DEVELOPMENTS LTD

We’re Ready To Help

Part O Building Regulations

We’re Ready To Help

Overheating Calculation

Scroll To Top Arrow