What is sound testing?




Sound testing checks the sound insulation of separating walls and floors in new or converted residential buildings.


enevo provides pre-completion sound testing for developers, contractors and project teams, with clear reporting and support from preparation through to Building Control submission.


Sound testing is used to assess sound insulation between relevant rooms and dwellings. Depending on the project, this can include:



  • Airborne sound testing – assessing sound travelling through separating walls and floors.

  • Impact sound testing – assessing sound transmitted through floors, typically using a standard tapping machine.


The testing requirements depend on the type of building, separating construction and whether the project involves new construction or a material change of use.


To request a quote, send us your project location, drawings, separating wall and floor details, and proposed testing date. We can discuss the testing requirements and site preparation before arranging a visit.


Send us your project details and we’ll send a quote

Our sound testing services

We review your drawings and construction details to discuss testing requirements and identify potential issues before testing. Icon

Initial compliance review

We review your drawings and construction details to discuss testing requirements and identify potential issues before testing.
We carry out the required airborne tests on separating walls and floors and impact tests on separating floors, using the relevant procedures and calibrated equipment. Icon

On-site testing

We carry out the required airborne tests on separating walls and floors and impact tests on separating floors, using the relevant procedures and calibrated equipment.
Discuss your proposed test date and reporting requirements with our team before arranging the visit. Icon

Testing programme

Discuss your proposed test date and reporting requirements with our team before arranging the visit.
You receive easy-to-understand test reports for your project team and Building Control. Icon

Clear reporting

You receive easy-to-understand test reports for your project team and Building Control.
If your project does not meet the required standards, we provide clear advice on remedial options and next steps. Icon

Advice and support

If your project does not meet the required standards, we provide clear advice on remedial options and next steps.
Our SITMA-accredited assessors cover projects throughout the UK. Icon

Nationwide coverage

Our SITMA-accredited assessors cover projects throughout the UK.
We review your drawings and construction details to discuss testing requirements and identify potential issues before testing. Icon

Initial compliance review

We review your drawings and construction details to discuss testing requirements and identify potential issues before testing.
We carry out the required airborne tests on separating walls and floors and impact tests on separating floors, using the relevant procedures and calibrated equipment. Icon

On-site testing

We carry out the required airborne tests on separating walls and floors and impact tests on separating floors, using the relevant procedures and calibrated equipment.
Discuss your proposed test date and reporting requirements with our team before arranging the visit. Icon

Testing programme

Discuss your proposed test date and reporting requirements with our team before arranging the visit.
You receive easy-to-understand test reports for your project team and Building Control. Icon

Clear reporting

You receive easy-to-understand test reports for your project team and Building Control.
If your project does not meet the required standards, we provide clear advice on remedial options and next steps. Icon

Advice and support

If your project does not meet the required standards, we provide clear advice on remedial options and next steps.
Our SITMA-accredited assessors cover projects throughout the UK. Icon

Nationwide coverage

Our SITMA-accredited assessors cover projects throughout the UK.

When is sound testing required?

In England, pre-completion testing helps demonstrate compliance with Requirement E1 of the Building Regulations. The regulatory guidance below describes England; requirements elsewhere depend on the project location.

In England, pre-completion testing generally applies to relevant new dwelling-houses, flats and rooms for residential purposes, including those formed by material changes of use.

Qualifying new houses and flats can use registered Robust Details as an alternative to pre-completion testing for the relevant separating construction, provided the scheme and Building Control notification conditions are met. Confirm the applicable route with Building Control.

The exact number and type of tests depends on the development. Building Control determines the properties to be tested, with testing typically organised around groups of properties with similar construction.

If you're unsure what your project requires, we can review the proposed construction and testing requirements before testing takes place.

For guidance on meeting the requirements in England, see Approved Document E.

What if a sound test fails?

A failed test needs investigation and appropriate remedial action. It can also raise questions about other rooms or properties with similar construction.

Agree the remedial work and any wider testing with Building Control.

Additional testing may also be required following remedial work. We can help identify potential issues and advise on the next stage of the process.

Our sound testing process

01


Initial review
We review your plans and testing requirements and answer any early questions.

02


Preparation
You prepare the building for testing by making sure floors, doors, and walls are ready and accessible.

03


Airborne sound test
We place a loudspeaker in one room to generate sound and measure how much is heard in the adjoining space.

04


Impact sound test
An impact sound test is performed by placing a tapping machine on the upper floor room and then measuring the sound pressure level in the room below.

05


Results analysis
Our team standardises the measured levels and compares them against the legal limits set by Part E.

06


Documentation
We supply all documents to meet your deadlines.
Test-date readiness checklist Icon

Sound Testing

Test-date readiness checklist

Testing should take place when the relevant spaces on both sides of the separating construction are essentially complete, apart from decoration, and ready for assessment.

Walls, floors, doors and other relevant elements need to be sufficiently complete and accessible for testing. Planning this early helps avoid delays caused by incomplete areas, restricted access or construction changes.

Before the visit, check the following with your site team and testing engineer:

  • Confirm the dwellings, rooms and separating walls or floors to be tested, and share the relevant plans and construction details.
  • Check that the rooms are essentially complete apart from decoration, with windows and doors fitted and relevant seals, junctions and service penetrations completed.
  • Arrange access to both sides of each wall or floor being tested, including any occupied or separately managed spaces.
  • Keep the test rooms clear and unfurnished, and arrange safe access for the engineer and equipment.
  • Coordinate noisy site work so it does not interfere with measurements, and agree any power and access arrangements needed for the equipment.
  • Agree floor-covering arrangements before the test, particularly for impact testing. Impact tests are normally carried out without soft coverings such as carpet, but Approved Document E includes exceptions for certain floor constructions. Confirm the correct arrangement with the testing engineer before laying or removing coverings.
  • Tell the testing team about incomplete work or changes to the separating construction before the visit.

Readiness should be confirmed before the test date. If you are unsure about a finish, floor covering or access arrangement, discuss it with the testing team before proceeding.

Test-date readiness checklist Image
Why enevo for sound testing? Image
Why enevo for sound testing? Icon

Sound Testing

Why enevo for sound testing?

  • Pre-completion airborne and impact testing for residential projects.
  • Practical advice on preparation and testing arrangements.
  • Clear reporting for your project team and Building Control.
  • Guidance on remedial options and next steps where a test does not meet the required standard.

Frequently Asked Questions

What affects sound testing cost?

Sound testing cost depends on the number and type of tests required, the site layout, separating construction and project location. The testing scope for a development can vary, so a project-specific quote is more useful than a single headline price.

What information do you need for a quote?

Send the site address, drawings showing the layout, separating wall and floor construction details, and your proposed testing programme. Include any testing requirements already agreed with Building Control so the quote can reflect the intended scope.

When should sound testing take place?

Testing should take place when the relevant spaces on both sides of the separating construction are essentially complete, apart from decoration, and ready for assessment.

Agree floor-covering arrangements before the test, particularly for impact testing. Impact tests are normally carried out without soft coverings such as carpet, but Approved Document E includes exceptions for certain floor constructions. Confirm the correct arrangement with the testing engineer before laying or removing coverings.

Does every property need a sound test?

The exact number and type of tests depends on the development. Building Control determines the properties to be tested, with testing typically organised around groups of properties with similar construction.

Qualifying new houses and flats can use registered Robust Details as an alternative to pre-completion testing for the relevant separating construction, provided the scheme and Building Control notification conditions are met. Confirm the applicable route with Building Control.

What happens if a sound test fails?

A failed test needs investigation and appropriate remedial action. It can also raise questions about other rooms or properties with similar construction.

Agree the remedial work and any wider testing with Building Control.

Additional testing may also be required following remedial work. We can help identify potential issues and advise on the next stage of the process.

How can we help you
with your project?

Testimonial IconTrusted, Time And Time Again

5 Star Rating

Harry gave me excellent advice and clear understanding on what BREEAM means as well about the specific accredited assessing required by professionals like Harry.

Angela Singh

5 Star Rating

Very efficient and professional service. Cant recommend enevo enough, glad I chose them for my project.

William Brannon

5 Star Rating

Very impressive on all aspects of energy calcs. Responsive and cost competitive. Highly recommended

Nick Spencer

5 Star Rating

enevo are always helpful, friendly and efficient in carrying out SAP calculations for our clients.

Lizzie Hicks

5 Star Rating

enevo were fantastic from start to finish and helped make each step of the project run smoothly. I would highly recommend and we will definitely be using again, if needed in the future.

Rees Doyle

5 Star Rating

We have always found enevo to provide an excellent service in the preparation of SAP Calculations and Assessments as well as EPC Certificates for projects that they have worked on for us. They are also reasonably priced so we would certainly recommend them to anyone looking for this type of service.

Martin Booker

5 Star Rating

Used enevo from start to completion of our recent project of 2No. new builds. Services included SAP/EPC and property air testing. Great service, understanding of requirements and cost. Person friendly company and good with communication.

Mark Radcliffe

5 Star Rating

Very efficient, personal, professional service, with a quick report turnaround. Highly recommended if you're a self-builder trying to navigate the complexities of the latest regulations.

Edward Broadhead

5 Star Rating

Always efficient and prompt service, enevo are an asset to my company, having used their services on multiple developments I wouldn't hesitate to recommend them.

Mac Chappell

5 Star Rating

Great service with a fast turnaround. Communication was excellent throughout. Richard the engineer was polite and professional. Will certainly be using enevo again.

ECO PROPERTY DEVELOPMENTS LTD

Scroll To Top Arrow